Made entirely of metal frame and within a period of 12 months, an industrial building of 202 sq.m. was constructed, covering the need of the owners to relocate their manufacturing craft.
The building is developed on 2 levels: on the ground floor of 119 sq.m. and on the first level 83 sq.m.
It includes electromechanical installations that cover:
- motor power of 35kW and thermal power of 100kW
- gas network for power of 195kW
- air supply network
The infrastructure includes an installed crane bridge with a lifting capacity of 1 tn and openings that cover the entry and exit of transport vehicles.